Santa Barbara County Prevailing Wage Rates (2026-2)
Current California prevailing wage rates for 18 crafts and 40 classifications published for Santa Barbara County in DIR determination STB-2026-2, with fringe benefits and overtime rates.
Santa Barbara County rates by craft
| Classification | Basic rate | Fringe | Total / hour | Expires | |||
|---|---|---|---|---|---|---|---|
| Brick Tender | |||||||
| Forklift Operator | $46.68 | $25.72 | $72.40 | 06/30/2027 increase due | |||
| Brick Tender | $46.23 | $25.72 | $71.95 | 06/30/2027 increase due | |||
| Bricklayer | |||||||
| Bricklayer, Cement Blocklayer, Pointer, Caulker, Cleaner | $55.10 | $23.26 | $78.36 | 04/30/2027 increase due | |||
| Stonemason, Marble Mason | $55.10 | $22.86 | $77.96 | 04/30/2027 increase due | |||
| Mason Finisher | $49.59 | $20.94 | $70.53 | 04/30/2027 increase due | |||
| Carpet, Linoleum & Resilient Tile | |||||||
| Resilient Tile Layer | $46.85 | $20.66 | $67.51 | 12/31/2026 increase due | |||
| Material Handler | $18.74 | $14.95 | $33.69 | 12/31/2026 increase due | |||
| Drywall Finisher | |||||||
| Drywall Finisher | $52.33 | $31.49 | $83.82 | 08/31/2027 increase due | |||
| Electrician | |||||||
| Cable Splicer | $56.61 | $26.04 | $82.65 | 05/31/2026 until superseded | |||
| Inside Wireman | $54.61 | $25.96 | $80.57 | 05/31/2026 until superseded | |||
| Sound Installer | $52.16 | $18.64 | $70.80 | 12/26/2026 increase due | |||
| Field Surveyor | |||||||
| Chief of Party (018.167-010) | $68.91 | $41.47 | $110.38 | 06/30/2027 increase due | |||
| Instrumentman (018.167-034) | $61.26 | $41.30 | $102.56 | 06/30/2027 increase due | |||
| Chainman/Rodman (869.567-010) | $60.68 | $41.25 | $101.93 | 06/30/2027 increase due | |||
| Glazier | |||||||
| Glazier | $63.08 | $28.40 | $91.48 | 07/30/2027 increase due | |||
| Marble Finisher | |||||||
| Marble Finisher | $46.97 | $18.58 | $65.55 | 05/31/2027 increase due | |||
| Painter | |||||||
| Industrial Painter | $50.07 | $21.40 | $71.47 | 06/30/2027 increase due | |||
| Iron and Steel | $45.67 | $21.00 | $66.67 | 06/30/2027 increase due | |||
| Painter, Lead Abatement | $43.59 | $20.94 | $64.53 | 06/30/2027 increase due | |||
| Graffiti Removal Worker Journeyman (Applies Only to Paint-Over Method) | $30.45 | $10.22 | $40.67 | 01/31/2027 increase due | |||
| Graffiti Removal Worker 2 (Applies Only to Paint-Over Method) | $21.82 | $10.22 | $32.04 | 01/31/2027 increase due | |||
| Graffiti Removal Worker 1 (Applies Only to Paint-Over Method) | $20.95 | $10.22 | $31.17 | 01/31/2027 increase due | |||
| Plaster Tender | |||||||
| Plaster Tender | $51.32 | $29.63 | $80.95 | 08/03/2027 increase due | |||
| Plaster Clean-Up Laborer | $48.77 | $29.63 | $78.40 | 08/03/2027 increase due | |||
| Plasterer | |||||||
| Plasterer | $47.77 | $33.43 | $81.20 | 07/31/2027 increase due | |||
| Plumber | |||||||
| Plumber, Industrial and General Pipefitter | $64.83 | $29.39 | $94.22 | 08/31/2027 increase due | |||
| Service and Repair | $62.86 | $28.41 | $91.27 | 08/31/2027 increase due | |||
| Fire Sprinkler Fitter (Protection and Control Systems, Overhead and Underground) | $52.72 | $30.02 | $82.74 | 12/31/2026 increase due | |||
| Sewer and Storm Drain Pipelayer | $51.94 | $26.16 | $78.10 | 08/31/2027 increase due | |||
| Refrigeration Service HVACR | $55.20 | $22.52 | $77.72 | 08/29/2027 increase due | |||
| Landscape/Irrigation Fitter | $47.85 | $28.55 | $76.40 | 08/31/2027 increase due | |||
| Sewer and Storm Drain Pipe Tradesman | $25.68 | $14.17 | $39.85 | 08/31/2027 increase due | |||
| Refrigeration Service Tradesman HVACR | $22.36 | $13.54 | $35.90 | 08/29/2027 until superseded | |||
| Landscape/Irrigation Tradesman | $21.98 | $5.56 | $27.54 | 08/31/2027 increase due | |||
| Roofer | |||||||
| Roofer | $16.90 | $13.57 | $30.47 | 03/31/2026 until superseded | |||
| Sheet Metal Worker (HVAC) | |||||||
| Sheet Metal Worker (HVAC) | $59.54 | $37.55 | $97.09 | 07/31/2028 until superseded | |||
| Terrazzo Finisher | |||||||
| Terrazzo Finisher | $45.13 | $15.40 | $60.53 | 08/31/2026 until superseded | |||
| Terrazzo Worker | |||||||
| Terrazzo Worker | $52.67 | $15.84 | $68.51 | 08/31/2026 until superseded | |||
| Tile Finisher | |||||||
| Tile Finisher | $41.55 | $16.94 | $58.49 | 05/31/2027 increase due | |||
| Tile Setter | |||||||
| Tile Setter | $56.52 | $22.61 | $79.13 | 05/31/2027 increase due | |||
increase due a predetermined increase is scheduled after the expiration date. until superseded no increase is scheduled and the rate stays in effect until DIR issues a new one, even after the date shown. Overtime columns already include fringe benefits at straight time.
Key facts for Santa Barbara County
- The highest total package is Field Surveyor – Chief of Party (018.167-010) at $110.38 per hour ($68.91 basic + $41.47 fringe).
- The lowest is Plumber – Landscape/Irrigation Tradesman at $27.54 per hour.
- 33 rates have a predetermined increase scheduled, and 7 rates remain in effect until superseded.
- 7 rates reach the expiration date and a scheduled increase in the next four months: Carpet, Linoleum & Resilient Tile, Electrician, Painter, Plumber.
- Basic crafts such as carpenter, laborer, operating engineer and ironworker are published by region rather than by county. See regional determinations.
How to use these rates
Use the determination that was in effect on the date the project was first advertised for bid, and pay each worker for the classification of the work actually performed. If a rate is marked "increase due", the increase applies to work performed after it takes effect, even on projects already underway. Read how to read a wage determination and our California prevailing wage guide for the full rules.
Frequently asked questions
What is the prevailing wage in Santa Barbara County, California?
It depends on the craft and classification. In determination STB-2026-2 the total hourly rates for the 40 classifications published by county range from $27.54 (Plumber – Landscape/Irrigation Tradesman) to $110.38 (Field Surveyor – Chief of Party (018.167-010)), with a median of $74.40 per hour including fringe benefits.
What is the highest prevailing wage rate in Santa Barbara County?
Field Surveyor – Chief of Party (018.167-010): $68.91 basic hourly rate plus $41.47 in fringe benefits, for a total of $110.38 per hour.
When will Santa Barbara County prevailing wage rates change?
33 rates in this county carry a double asterisk, meaning a predetermined increase is scheduled after the expiration date. DIR issues new general determinations every February 22 and August 22; the next scheduled issue is February 22, 2027.
Do these rates include fringe benefits?
Yes. The total hourly rate is the basic hourly rate plus health and welfare, pension, vacation/holiday, training and other payments. Employers can meet the fringe part with plan contributions, cash, or both.