Certified Payroll for Prevailing Wage Jobs: WH-347, California eCPR and Common Mistakes
How certified payroll works on Davis-Bacon and California public works: what to include, Form WH-347, DIR electronic certified payroll, deadlines and the mistakes that trigger penalties.
A certified payroll is a weekly payroll report that a contractor signs under penalty of perjury to confirm that every worker on a prevailing wage project was paid correctly. It is the main way agencies and workers verify compliance, and the most common source of penalties.
What a certified payroll contains
- Contractor, project and payroll week.
- Each worker's name and identifying number, classification, and whether they are a journeyworker or registered apprentice (with their level).
- Hours worked each day, split by classification and by straight time and overtime.
- Rate of pay, gross wages for the project and for all work that week, deductions and net pay.
- Fringe benefits: how much was paid to plans and how much in cash.
- A signed Statement of Compliance.
Federal projects: Form WH-347
On Davis-Bacon projects, payrolls go to the contracting or sponsoring agency every week that work is performed. DOL's Form WH-347 is optional; any format with the same data and the signed statement is acceptable. Contractors must keep payroll records for at least three years after the work is completed.
California projects: electronic certified payroll
On California public works that require DIR registration, contractors and subcontractors upload certified payroll records to the Labor Commissioner through DIR's eCPR system, either by filling out the online form or uploading an XML file from payroll software. Records must be furnished at least monthly or more often if required by the contract or the Labor Commissioner, and the awarding agency can also demand copies. Workers and the public may request copies (with personal information redacted for the public).
Common mistakes
- Wrong classification. Paying a laborer rate for work within an electrician's scope is the classic violation. Check the scope of work documents.
- Wrong county or wrong determination. Use the county of the work and the determination in effect at bid advertisement.
- Missing predetermined increases. Rates marked ** go up during the project.
- Unannualized fringe credit. Taking the full plan contribution per hour on public work only, instead of spreading it across all hours. See the fringe calculator.
- Apprentices not registered. Unregistered "apprentices" must be paid the journeyworker rate.
- Overtime on the wrong base. Premiums apply to the basic rate, not to the fringe portion.
- Late or unsigned reports. Missing weeks can trigger daily penalties.
Practical tips
- Set up each project in your payroll system with its own rates by classification and the date of every scheduled increase.
- Collect daily time sheets that record the classification of work, not just hours.
- Reconcile plan contributions with the fringe amounts claimed on the payroll every quarter.
- Keep subcontractor payrolls on file: in California, the prime can be liable for a sub's unpaid wages.
Sources
- 29 CFR § 5.5(a)(3); U.S. DOL – Form WH-347.
- California Labor Code § 1776; 8 CCR § 16401; DIR – Certified payroll reporting.
Frequently asked questions
Is Form WH-347 mandatory?
No. It is optional. Any format that contains the same information and the signed Statement of Compliance is acceptable on federal projects.
How long must certified payroll records be kept?
On federal Davis-Bacon projects, at least three years after the work is completed. California contractors should keep records at least as long and follow any longer contract requirements.
Do small California projects need electronic certified payroll?
Projects below the registration thresholds ($25,000 for construction, $15,000 for maintenance) are generally exempt from electronic reporting, but prevailing wages and payroll record-keeping still apply.